ST: 4 How is it made

Revision Date: 2005-09-06

These steps assume that variables data has been collected over time, and that a control chart and histogram have been completed. The control chart should show no special causes, and the histogram should reveal that the data is normally distributed.

In the example, the team examined the arrival time of couriers in comparison to the scheduled arrival time over a month. Since time is being measured, the data is variables. The team completed a histogram and found the data to be normal. An
X- R control chart was also completed, showing no special causes of variation.
Since a control chart must be completed before performing capability analysis, the calculations from the control chart can be utilized. The information taken from the control chart follows:

  • The sample size used in the control chart, n
  • The overall average, (from an  chart) or (from an X-MR chart.)
  • The average range,(from an  chart) or (from an X-MR chart.)

The numerical specifications or requirements should also be known. Information for the example is shown below:

  • n    = 5
  •     = 10.00
  •     = 4.653
  • USL = upper specification limit = 14 minutes
  • LSL = lower specification limit = 0 minutes (on time)

How is it made steps:

4.1 Sketch the distribution
4.2 Calculate the estimated standard deviation.
4.3 Determine the location of the tails for the distribution
4.4 Draw the specification limits on the distribution
4.5 Calculate how much data is outside the specifications
4.6 Calculate and interpret the capability indices
4.7 Analyze the Results

 
See also:
1 What is it?

2 What does it look like?

 3 When is it used?
 

Attachments Attachments
There are no attachments for this article.
Related Articles RSS Feed
ST: 4.6.3. Interpret Cp and Cpk
Viewed 11481 times since Thu, Jan 10, 2008
ST: 4.7. Analyze the Results
Viewed 1893 times since Fri, Nov 9, 2007
ST: 4.4. Draw the specification limits on the distribution
Viewed 2242 times since Fri, Nov 9, 2007
ST: 4.1. Sketch the distribution
Viewed 2109 times since Fri, Nov 9, 2007
ST: 4.5.1. Find the percentage above the upper specification
Viewed 2197 times since Fri, Nov 9, 2007
ST: 2 What does it look like
Viewed 2041 times since Fri, Nov 9, 2007
ST: 4.5.3. Determining the total percentage outside the specifications
Viewed 2514 times since Fri, Nov 9, 2007
ST: 4.6.1. Calculate Cp
Viewed 6384 times since Fri, Nov 9, 2007
ST: 4.2. Calculate the estimated standard deviation
Viewed 2894 times since Fri, Nov 9, 2007
ST: 4.6.4. Calculate Cpu and Cpl
Viewed 8531 times since Wed, Nov 14, 2007