Home » Categories » Statistics » Capability » Capability Analysis (from Practical Tools for Continuous Improvement)

ST: 4 How is it made

Revision Date: 2005-09-06

These steps assume that variables data has been collected over time, and that a control chart and histogram have been completed. The control chart should show no special causes, and the histogram should reveal that the data is normally distributed.

In the example, the team examined the arrival time of couriers in comparison to the scheduled arrival time over a month. Since time is being measured, the data is variables. The team completed a histogram and found the data to be normal. An
X- R control chart was also completed, showing no special causes of variation.
Since a control chart must be completed before performing capability analysis, the calculations from the control chart can be utilized. The information taken from the control chart follows:

  • The sample size used in the control chart, n
  • The overall average, (from an  chart) or (from an X-MR chart.)
  • The average range,(from an  chart) or (from an X-MR chart.)

The numerical specifications or requirements should also be known. Information for the example is shown below:

  • n    = 5
  •     = 10.00
  •     = 4.653
  • USL = upper specification limit = 14 minutes
  • LSL = lower specification limit = 0 minutes (on time)

How is it made steps:

4.1 Sketch the distribution
4.2 Calculate the estimated standard deviation.
4.3 Determine the location of the tails for the distribution
4.4 Draw the specification limits on the distribution
4.5 Calculate how much data is outside the specifications
4.6 Calculate and interpret the capability indices
4.7 Analyze the Results

 
See also:
1 What is it?

2 What does it look like?

 3 When is it used?
 

Attachments Attachments
There are no attachments for this article.
Related Articles RSS Feed
ST: 4.6.2. Calculate Cpk
Viewed 10549 times since Fri, Nov 9, 2007
ST: 4.7. Analyze the Results
Viewed 1823 times since Fri, Nov 9, 2007
ST: 1 What is it
Viewed 2507 times since Fri, Nov 9, 2007
ST: 4.5.1. Find the percentage above the upper specification
Viewed 2130 times since Fri, Nov 9, 2007
ST: 4.6. Calculate and interpret the capability indices
Viewed 3519 times since Mon, Dec 10, 2007
ST: 4.3. Determine the location of the tails for the distribution
Viewed 2131 times since Fri, Nov 9, 2007
ST: 4.2. Calculate the estimated standard deviation
Viewed 2803 times since Fri, Nov 9, 2007
ST: 4.4. Draw the specification limits on the distribution
Viewed 2158 times since Fri, Nov 9, 2007
ST: 4.5. Calculate how much data is outside the specifications
Viewed 2406 times since Fri, Nov 9, 2007
ST: 4.6.3. Interpret Cp and Cpk
Viewed 11265 times since Thu, Jan 10, 2008